Diamond Wire Sawing for Heavy Infrastructure Projects
At some point on every major rock or concrete project, there is a section where blasting or hammering is excluded, vibration limits are tight, or geometry has to be exact — and the standard methods simply cannot deliver. That section is our territory. Trosscut Europe has resolved exactly these situations for main contractors across Northern Europe since 2002 — 24+ years, 100% project success rate, zero failed programmes. — WHEN CONTRACTORS CALL US ▸ Blasting excluded — urban site, railway or sensitive neighbour ▸ Vibration monitoring near its limit — stop-work risk ▸ Geometry must be exact — overbreak is not acceptable ▸ Shaft or tunnel bottleneck threatening your programme — no specialist available at short notice ▸ Heavily reinforced concrete — standard saws underpowered — WHAT YOU GET WHEN YOU CALL US ▸ Owner-operator on site — Priit Purde leads every job personally. No project manager chain, no handover risk. ▸ Mobilisation in days, not weeks — equipment in Sweden, Finland and Estonia. Typical lead time: 5–7 working days. ▸ Documentation ready from day one — method statement, risk assessment and vibration monitoring plan submitted before we touch the rock. ▸ Works in live environments — Helsinki Olympic Stadium, Gothenburg Harbour, Stockholm urban shafts — zero site stoppages caused. ▸ Invoicing in your country — registered in SE · FI · EE. Local VAT, no cross-border complications. ▸ Quote within 24 hours — send drawings and constraints, we respond with scope and price within one working day. — TECHNICAL SCOPE Diamond Wire Sawing — Rock & Concrete All materials incl. heavy rebar. Up to 2000 m² in one continuous cut. 5 wire saw units, different sizes. Vertical & Horizontal Shafts Shafts to 50 m depth. Blind cuts to 50 m. Tunnel portals. Underground openings to any geometry. DTH Rock Drilling Ø95–254 mm · up to 100 m depth · any angle · granite and limestone · pre-split drilling before blasting. Marine & Heavy Concrete Quay slabs, bridge beams, industrial foundations. Continuous cut with no shutdown of surrounding operations. — PROJECTS COMPLETED FOR MAIN CONTRACTORS Vertical shaft — Stockholm - 47 m shaft in limestone — world's deepest wire-sawn shaft - Blasting excluded, vibration-sensitive urban site, section 6.4×6.2 m Result: exact geometry, zero overbreak, programme maintained Olympic Stadium — Helsinki - 2500 m² cuts in active Olympic complex - Events running in parallel throughout the project Result: zero disruption to stadium operations Harbour Quay — Gothenburg - 200 m heavily reinforced quay structure, 5-week programme - Port traffic continued without interruption Result: on time, port never stopped LKAB Iron Ore Silo — Norrbotten, Sweden - Precision cutting and controlled removal of large industrial silo - Tight tolerances, working within live industrial facility Result: full programme delivered on spec Rock cutting — Turku, Finland - 1000 m² in live city infrastructure - Strict vibration limits, controlled geometry required throughout Result: faster than planned, minimal overbreak — WHERE WE OPERATE Sweden · Finland · Norway · Estonia Supporting contractors, developers and infrastructure projects across Northern Europe. — Call us. We will ask two questions and tell you within 24 hours whether we can help and what it will cost. If you have drawings or a project description — send those too. We will come back with scope and price, not a sales pitch. 📞 +372 513 4890 ✉ info@trosscut.com 🌐 www.trosscut.com Active in: Sweden · Finland · Norway · Estonia Trosscut Europe OÜ · SE: SE502081-6202 · FI: FI2736453-3 · EE: 12473301
Call Us / Ask Quote → +372 513 4890 | Write Us → info@trosscut.com
Call Us/ Ask Offer+372 5134890